Lodha Green Integrated Data Centre Park brings a 2 GW digital infrastructure hub to Palava
Price on Request
The Lodha Green Integrated Data Centre Park is a digital infrastructure development planned within Palava, Lodha's integrated township in Thane district near Dombivli. The Maharashtra government has signed a memorandum of understanding with Lodha Developers Ltd to build the park, positioning it as one of the state's first projects under its Green Integrated Data Centre Parks policy introduced in October 2024. Under the agreement, Lodha will serve as the developer for multiple domestic and international players looking to establish data centres within the park.
The park is planned across 370 acres with a designed capacity of 2 gigawatts, intended to draw investments exceeding Rs 30,000 crore from Lodha and the data centre operators who set up within it. The initiative is expected to generate around 6,000 direct and indirect jobs, extending Palava's role beyond residential and commercial development into large-scale digital infrastructure. Lodha's own township communications point to global technology names such as Amazon Web Services and Singapore-based ST Telemedia setting up data centres at the park in the near future.
Sustainability sits at the centre of the design brief. The facility is planned to run on renewable and alternative energy sources rather than conventional power, in line with the state policy that requires new data parks to draw primarily on clean energy. Abhishek Lodha, Managing Director and Chief Executive Officer of Lodha Developers, has said the company is committed to the success of the Green Integrated Data Centre Park and to partnerships that support India's digital growth ambitions.
For Lodha, the timing builds on four decades of the group's presence in Mumbai real estate, since Mangal Prabhat Lodha founded the company in 1980, and on more than a decade of work shaping Palava into a planned township since 2009. Palava is described in Lodha's own investor communications as a crucial growth driver for the group, expected to deliver significant annual sales over the coming decade, and the data centre park extends that township's ambit into India's expanding digital economy alongside its existing residential, retail and social infrastructure.
The Lodha Green Integrated Data Centre Park marks Palava's entry into the country's data infrastructure story, backed by a state-level policy framework, a master developer with a long township track record, and a site large enough to host multiple hyperscale operators over time.
Pricing on request — speak with our sales team.




Detailed master plan and unit-wise floor plans available on request.
Kalyan-Shil Road corridor, Dombivli, Thane district, Maharashtra · Palava · Thane
Palava is Lodha's 5,000-acre planned township in Thane district, positioned between Thane, Navi Mumbai and Kalyan, and it is here that the Lodha Green Integrated Data Centre Park is coming up. The Maharashtra government and Lodha Developers signed a memorandum of understanding for this park, with the facility designed to run on renewable and alternative energy under the state's Green Integrated Data Centre Parks policy. The site draws on Palava's existing scale, with the wider township already housing over 200,000 residents and functioning as a self-contained urban node within the Mumbai Metropolitan Region.
The data centre park's address value lies in the same fundamentals that have made Palava a growth engine for Lodha: contiguous, shovel-ready land, proximity to the Kalyan-Shil Road corridor, and a position at the centre of the Thane-Navi Mumbai-Kalyan economic triangle. Two large global data centre players had already acquired land in Palava in 2024 and 2025, and the broader corridor is set to gain from upcoming connectivity works including the Mumbai Trans-Harbour Link, Metro Line 12 and the Airoli-Katai Naka tunnel.
See the property in person. Our sales team will get in touch to coordinate a visit at your convenience.
The sea link connecting Mumbai to Navi Mumbai is set to shorten travel times across the region, strengthening the Thane-Navi Mumbai-Kalyan corridor within which Palava and the data centre park sit.
This under-development freeway via the Parsik Hill tunnel is expected to cut travel between Palava and Navi Mumbai's business districts, improving access for the park's workforce and operators.
An approved metro line with stations planned in and around Palava will add mass-transit access to the township, supporting daily movement for the data centre park's engineering and support staff.
Maharashtra's October 2024 policy mandates renewable and alternative energy for new data parks in the MMR, directly shaping the power framework for this project and two other planned parks in the region.
Ongoing expansion of roads, water and social infrastructure across Palava's 5,000-acre township continues to support the surrounding ecosystem in which the data centre park is being planned.
The park is anchored by a memorandum of understanding between Lodha Developers and the Maharashtra government, giving it a formal policy and facilitation framework for approvals and incentives from the outset.
Spanning 370 acres within Lodha's established 5,000-acre Palava township, the park benefits from contiguous, largely ready land inside an ecosystem the group has been developing since 2009.
The facility is planned to run on renewable and alternative energy sources under Maharashtra's Green Integrated Data Centre Parks policy, aligning it with national net-zero and sustainability priorities.
A designed capacity of 2 gigawatts positions the park to host multiple large domestic and international data centre operators simultaneously, rather than a single tenant.
Lodha's own township communications point to global names such as Amazon Web Services and Singapore-based ST Telemedia as early entrants, signalling credibility among hyperscale operators.
Lodha Developers, founded in 1980 and now one of India's largest listed real estate companies, brings four decades of large-format development experience and direct control of the Palava township as master developer.
Visited or booked here? Share your honest experience. Reviews are checked before they appear.
Pricing, plans, brochure, and a personal walkthrough — talk to our sales team.